10 Nov

STORAGE AND PROCESS TANKS

SCOPE: Construction of storage and process tanks for CPF1 and CPF2 Rubiales field. Head tanks – Skim tanks – process FWKO oil storage tank – water storage tank, water storage tank for fire suppression system. CUSTOMER: Meta Petroleum Corp. AMOUNT: 30 MM USD LOCATION: Colombia

10 Nov

PWTS SURIA AND REFORMA

SCOPE: Works for construction and installation of new facilities system of produced water treatment stations in Suria and Reforma, with an option of treatment system at Apiay station. CUSTOMER: Ecopetrol S.A. AMOUNT: 18.5 MM USD LOCATION: Colombia

10 Nov

DRYING PLANT OF LNG

SCOPE: Detailed engineering of storage tanks, construction and site assembly, design, supply, installation and testing of instruments and supply of all materials needed for construction of this gas drying plant. CUSTOMER: Valerus Compression Services Ltd. AMOUNT: 14.2  MM USD LOCATION: Colombia

10 Nov

MECHANICAL ASSEMBLY OF BELLO WASTE WATER TREATMENT

SCOPE: Mechanical assembly of equipment, installation of piping, and instrumentation of Bello waste water treatment plant (WWTP Bello). CUSTOMER: Cliente AMOUNT: 3.9  MM USD LOCATION: Colombia

10 Nov

ELECTRICAL AND INSTRUMENTATION INSTALLATION PLANT IRON BRIQUETTES

SCOPE: Transformers assembly, two 30 MVA from 115 kV to 4,160 V, four of 20 MVA from 115 kV to 4,160 V and Twenty-three of 3 MVA; installation of 430 motors and 490 Km of Power cables plus 709 Km of instrumentation cable. Installation of 4,400 instruments and the realization of 11,000 test loops. CUSTOMER: Orinoco Iron. [...]

10 Nov

ACACIAS PWT MODULE II

SCOPE: Construction and erection of equipment, process piping, inlet facilities, skids and complementary works in "Acacias" station. PWT Module I (Production wáter treatment system). CUSTOMER: Ecopetrol S.A. AMOUNT: 17 MM USD LOCATION: Colombia

10 Nov

ACACIAS PWT MODULE I

SCOPE: Construction and erection of equipment, process    piping, inlet facilities, skids and complementary works       in "Acacias" station. PWT Module I (Production wáter treatment system). CUSTOMER: Ecopetrol S.A. AMOUNT: 11 MM USD LOCATION: Colombia

10 Nov

COMPRESSOR STATIONS GASODUCTO BALLENA-BARRANCABERMEJA

SCOPE: EPC contract, detailed engineering, supply of materials and equipments (except compressor units), construction, installation, test and start up of 4 new gas compressor stations located at: Puente Guillermo (Santander), La Jagua del Pilar (La Guajira), Curumaní and San Alberto (Cesar). CUSTOMER: TGI Grupo Energía de Bogotá AMOUNT: 72 MM USD LOCATION: Colombia