LOADING...
  • Español
    • Portugués
    • English
Logo
info@sdvgroup.com
  • Home
  • About us
    • HISTORY
    • MISSION
    • VISION
    • INTEGRATED MANAGEMENT SYSTEM
    • INTEGRAL MANAGEMENT POLICY
  • BUSINESS AREAS
    • TRANSMISSION SYSTEMS
    • INDUSTRIAL INSTALLATIONS
  • PRESENCE
  • PROJECTS
  • CONTACT US
  • language
    • Spanish
    • Portuguese

MECHANICAL ASSEMBLY OF BELLO WASTE WATER TREATMENT

  • INDUSTRIAL INSTALLATIONS
  • 10 Nov, 2017

SCOPE: Mechanical assembly of equipment, installation of piping, and instrumentation of Bello waste water treatment plant (WWTP Bello).

CUSTOMER: Cliente

AMOUNT: 3.9  MM USD

LOCATION: Colombia

PREVIOUS POST

ELECTROMECHANICAL ASSEMBLY OF THE HYDROELECTRIC CENTRAL THE VUELTOSA

NEXT POST

DRYING PLANT OF LNG

PORTFOLIO RELATED

HYDRO – TREATMENT PLANT AT BARRANCABERMEJA REFINERY (HDT)

CONSTRUCTION OF PLANT OF COGENERATION AND RECOVERY CO2

ACACIAS PWT MODULE II

DRYING PLANT OF LNG

COMPRESSOR STATIONS GASODUCTO BALLENA-BARRANCABERMEJA

Copyright © 2017 SDV. Todos los derechos reservados | Bogota - Colombia