LOADING...
  • Español
    • Portugués
    • English
Logo
info@sdvgroup.com
  • Home
  • About us
    • HISTORY
    • MISSION
    • VISION
    • INTEGRATED MANAGEMENT SYSTEM
    • INTEGRAL MANAGEMENT POLICY
  • BUSINESS AREAS
    • TRANSMISSION SYSTEMS
    • INDUSTRIAL INSTALLATIONS
  • PRESENCE
  • PROJECTS
  • CONTACT US
  • language
    • Spanish
    • Portuguese

ELECTROMECHANICAL ASSEMBLY OF THE HYDROELECTRIC CENTRAL THE VUELTOSA

  • INDUSTRIAL INSTALLATIONS
  • 10 Nov, 2017

SCOPE: Electromechanical assembly of two hydraulics turbines type Francis of 257 MW each and two generators of 266 MVA, Substations of 230 kV.

CUSTOMER: Alstom Hydro Venezuela

AMOUNT: 51.66 MM USD

LOCATION: Venezuela

PREVIOUS POST

ELECTRICAL AND INSTRUMENTATION INSTALLATION PLANT IRON BRIQUETTES

NEXT POST

MECHANICAL ASSEMBLY OF BELLO WASTE WATER TREATMENT

PORTFOLIO RELATED

DRYING PLANT OF LNG

OPERATIVE CENTER CAMPO SANTA ROSA

HYDRO – TREATMENT PLANT AT BARRANCABERMEJA REFINERY (HDT)

CONSTRUCTION OF PLANT OF COGENERATION AND RECOVERY CO2

CONSTRUCTION OF PROPYLENE PLANT

Copyright © 2017 SDV. Todos los derechos reservados | Bogota - Colombia