LOADING...
  • Español
    • Portugués
    • English
Logo
info@sdvgroup.com
  • Home
  • About us
    • HISTORY
    • MISSION
    • VISION
    • INTEGRATED MANAGEMENT SYSTEM
    • INTEGRAL MANAGEMENT POLICY
  • BUSINESS AREAS
    • TRANSMISSION SYSTEMS
    • INDUSTRIAL INSTALLATIONS
  • PRESENCE
  • PROJECTS
  • CONTACT US
  • language
    • Spanish
    • Portuguese

MECHANICAL ASSEMBLY OF BELLO WASTE WATER TREATMENT

  • INDUSTRIAL INSTALLATIONS
  • 10 Nov, 2017

SCOPE: Mechanical assembly of equipment, installation of piping, and instrumentation of Bello waste water treatment plant (WWTP Bello).

CUSTOMER: Cliente

AMOUNT: 3.9  MM USD

LOCATION: Colombia

PREVIOUS POST

ELECTROMECHANICAL ASSEMBLY OF THE HYDROELECTRIC CENTRAL THE VUELTOSA

NEXT POST

DRYING PLANT OF LNG

PORTFOLIO RELATED

ELECTRICAL AND INSTRUMENTATION INSTALLATION PLANT IRON BRIQUETTES

PWTS SURIA AND REFORMA

HYDRO – TREATMENT PLANT AT BARRANCABERMEJA REFINERY (HDT)

ACACIAS PWT MODULE I

COMPRESSOR STATIONS GASODUCTO BALLENA-BARRANCABERMEJA

Copyright © 2017 SDV. Todos los derechos reservados | Bogota - Colombia